English
  • English
  • 中文
图片展示

Service Hotline:

188-5155-0999 

Search keywords: high and low pressure manifold pry, large diameter universal manifold, chip trap manifold

Application scenarios and typical cases of high and low pressure pipe manifold pry!

Click: Time:2025-03-17 13:28:47

Application scenarios and typical cases of high and low pressure pipe manifold pry!

• Shale gas development: in Sichuan Basin, the Junggar Basin, Xinjiang and other regions, it is used for fracturing and production test of ultra-high pressure gas wells (such as Dongyeshen 5 Well and Yuanba 701 Well) to ensure continuous construction under 140MPa high pressure environment.

Economic benefits: A single platform can save costs, mainly due to the installation efficiency improvement brought by process integration.

Technological Evolution Trends

Functional integration: Expanding from a single fracturing function to full cycle operations such as gas testing, production, and pressurization, forming a 'one-stop' solution.

Intelligent upgrade: Some models have introduced electro-hydraulic control systems to achieve remote and precise adjustment.






图片展示

Contact Us

 

Mr. Liu (General Manager) mobile phone:18851550999 
Telephone:0515-86150688
fax:0515-86150688
address:New Century Road, Petroleum Equipment Industrial Park, Jianyang Town, Jianhu County

email: 79157345@qq.com
URL: http://www.zrjxzz.com 

Jiangsu Zhongrui Machinery Manufacturing Co., Ltd. All rights reserved   

Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.